Toyota Venza manuals

Toyota Venza: Installation

INSTALLATION

PROCEDURE

1. INSTALL NO. 2 COOLING FAN MOTOR

(a) Install the No. 2 cooling fan motor with the 3 screws.

Torque:

w/o Towing package :

2.6 N·m {26 kgf·cm, 23 in·lbf}

w/ Towing package :

3.9 N·m {40 kgf·cm, 35 in·lbf}


(b) Connect the No. 2 cooling fan motor connector and 2 clamps.


2. INSTALL COOLING FAN MOTOR

(a) Install the cooling fan motor with the 3 screws.

Torque:

w/o Towing package :

2.6 N·m {26 kgf·cm, 23 in·lbf}

w/ Towing package :

3.9 N·m {40 kgf·cm, 35 in·lbf}


3. INSTALL COOLING FAN MOTOR INSULATOR

(a) Install the cooling fan motor insulator with the 2 bolts.

Torque:

2.6 N·m {26 kgf·cm, 23 in·lbf}


4. INSTALL NO. 2 FAN

(a) Install the No. 2 fan with the nut.

Torque:

6.3 N·m {64 kgf·cm, 56 in·lbf}


5. INSTALL FAN

(a) Install the fan with the nut.

Torque:

6.3 N·m {64 kgf·cm, 56 in·lbf}


6. INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR

HINT:

See page


Removal
REMOVAL PROCEDURE 1. REMOVE RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR HINT: See page 2. REMOVE FAN (a) Remove the nut and fan. 3. ...

Cooling Fan System
...

Other materials about Toyota Venza:

Inspection
INSPECTION PROCEDURE 1. INSPECT PAD LINING THICKNESS (a) Using a ruler, measure the pad lining thickness. Text in Illustration *1 Ruler Standard thickness of a new pad: 12.0 mm (0.472 ...

Precaution
PRECAUTION NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cable is reconnected. System Name See Procedure Back Door Closer System ...

Disassembly
DISASSEMBLY PROCEDURE 1. REMOVE FRONT TRANSAXLE CASE OIL SEAL (a) Using SST, remove the front transaxle case oil seal from the transaxle housing. SST: 09308-00010 2. REMOVE TRANSAXLE CASE OIL ...

© 2016-2025 Copyright www.tovenza.com

0.1683