INSTALLATION
PROCEDURE
1. INSTALL NO. 1 COOLER THERMISTOR
2. INSTALL COOLER EVAPORATOR SUB-ASSEMBLY
3. INSTALL BLOWER ASSEMBLY WITH COOLER EVAPORATOR SUB-ASSEMBLY
(a) Engage the 5 claws.
(b) Engage the guide and connect the wire harness.
(c) Install the blower assembly with cooler evaporator sub-assembly to the air conditioning radiator assembly with the 6 screws.
4. INSTALL COOLER EXPANSION VALVE
5. INSTALL AIR CONDITIONING HARNESS ASSEMBLY
6. INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY
7. INSTALL NO. 3 AIR DUCT SUB-ASSEMBLY
8. INSTALL NO. 2 FINISH PANEL MOUNTING BRACKET
9. INSTALL NO. 1 FINISH PANEL MOUNTING BRACKET
10. INSTALL AIR CONDITIONING UNIT ASSEMBLY
(See page )
Engine Immobiliser System Malfunction (B2799)
DESCRIPTION
This DTC is stored when one of the following occurs: 1) the ECM detects errors
in its own communications with the transponder key ECU assembly; 2) the ECM detects
errors in the communication lines; or 3) the ECU communication ID between the tr ...
Back Camera Disconnected (C1622)
DESCRIPTION
This DTC is stored if the navigation receiver assembly*1 or radio and display
receiver assembly*2 judges that the signals or signal lines between the navigation
receiver assembly*1 or radio and display receiver assembly*2, and the rear televis ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT GENERATOR CLUTCH PULLEY
(a) Hold the generator rotor using SST, and turn the clutch pulley clockwise
to check that the outer ring locks.
SST: 09820-63021
Text in Illustration
*1
...