REASSEMBLY
PROCEDURE
1. INSTALL NO. 1 INSTRUMENT PANEL PIN
(a) Install the 2 No. 1 instrument panel pins with the 2 screws <E> or <F>. |
|
2. INSTALL GLOVE BOX LIGHT ASSEMBLY
(a) Engage the 2 claws to install the glove box light assembly. |
|
3. INSTALL FRONT PASSENGER AIRBAG ASSEMBLY
4. INSTALL NO. 3 INSTRUMENT PANEL WIRE
(a) Engage the 4 clamps to install the No. 3 instrument panel wire. |
|
5. INSTALL NAVIGATION ANTENNA ASSEMBLY (w/ Navigation System)
6. INSTALL NO. 1 ANTENNA CORD SUB-ASSEMBLY
7. INSTALL HEATER TO REGISTER DUCT
(a) Install the heater to register duct with the 7 screws <E> or <F>.
8. INSTALL DEFROSTER NOZZLE ASSEMBLY
(a) Install the defroster nozzle assembly with the 4 screws <E> or <F>. |
|
9. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
(a) Install the No. 2 side defroster nozzle duct with the 2 screws <E> or <F>. |
|
10. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
(a) Install the No. 1 side defroster nozzle duct with the 2 screws <E> or <F>. |
|
Inspection
INSPECTION
PROCEDURE
1. INSPECT NO. 1 ULTRASONIC SENSOR
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified ...
Reassembly
REASSEMBLY
PROCEDURE
1. REPAIR INSTRUCTION
2. INSTALL REAR DOOR OUTSIDE MOULDING
3. INSTALL REAR DOOR LOWER OUTSIDE STRIPE
4. INSTALL NO. 2 BLACK OUT TAPE
5. INSTALL REAR DOOR OUTSIDE STRIPE
6. INSTALL REAR DOOR UPPER WINDOW FRAME MOULDIN ...
Washer Nozzle(for Rear Side)
Components
COMPONENTS
ILLUSTRATION
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT REAR WASHER NOZZLE
(a) With the engine running, check where the washer fluid hits the windshield.
Standard Measurement
Area
...