INSTALLATION
PROCEDURE
1. INSTALL WATER PUMP ASSEMBLY
(a) Install a new gasket and the water pump with the 7 bolts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} |
|
2. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
3. INSTALL GENERATOR ASSEMBLY
4. INSTALL WIRE HARNESS CLAMP BRACKET
5. INSTALL V-RIBBED BELT
HINT:
See page
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).
7. ADD ENGINE COOLANT
8. INSPECT FOR COOLANT LEAK
9. INSTALL COOL AIR INTAKE DUCT SEAL
10. INSTALL NO. 1 ENGINE UNDER COVER
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Uniform Tire Quality Grading
This information has been prepared in accordance with regulations issued by the
National Highway Traffic Safety Administration of the U.S. Department of Transportation.
It provides the purchasers and/or prospective purchasers of Toyota vehicles with
infor ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful bec ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL DRIVE MONITOR SWITCH
(a) Engage the 4 claws to install the driver monitor switch.
2. INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY WITH BRACKET (for Radio and Display ...