CAUTION / NOTICE / HINT
HINT:
PROCEDURE
1. |
VEHICLE BROUGHT TO WORKSHOP |
|
2. |
INSPECT BATTERY VOLTAGE |
(a) Inspect the battery voltage.
Standard Voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the battery before proceeding to the next step.
|
3. |
CHECK COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the LIN communication system is functioning normally.
Result |
Proceed to |
---|---|
LIN DTC is not output |
A |
LIN DTC is output |
B ( |
B | ![]() |
GO TO LIN COMMUNICATION SYSTEM |
|
4. |
CHECK COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM* |
(a) Use the Techstream to check if the CAN communication system is functioning normally.
Result |
Proceed to |
---|---|
CAN DTC is not output |
A |
CAN DTC is output |
B ( |
B | ![]() |
GO TO CAN COMMUNICATION SYSTEM |
|
5. |
CHECK FOR DTC* |
(a) Check for DTCs and note any code that is output.
(b) Clear the DTCs.
(c) Recheck for DTCs. Based on the DTCs output above, try to force the A/C system to output DTCs by simulating the conditions indicated by the DTC.
Result |
Proceed to |
---|---|
DTC is not output |
A |
DTC is output |
B |
B | ![]() |
GO TO STEP 8 |
|
6. |
PROBLEM SYMPTOMS TABLE |
(a) Refer to Problem Symptoms Table (See page
).
Result |
Proceed to |
---|---|
Fault is not listed in Problem Symptoms Table |
A |
Fault is listed in Problem Symptoms Table |
B |
B | ![]() |
GO TO STEP 8 |
|
7. |
OVERALL ANALYSIS AND TROUBLESHOOTING* |
(a) Panel diagnosis (indicator check) (See page
)
(b) Panel diagnosis (sensor check) (See page
)
(c) Panel diagnosis (actuator check) (See page
)
(d) Data List / Active Test (See page )
(e) Terminals of ECU (See page )
(f) On-vehicle Inspection
(g) Inspection
|
8. |
ADJUST, REPAIR OR REPLACE |
NEXT | ![]() |
END |
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. CHECK BATTERY CONDITION
NOTICE:
If the battery is weak or if the engine is difficult to start, perform the following
procedure.
(a) Check the battery for damage and deformation. If severe damage, deformation
or leaka ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL STUD BOLT (for LH Side)
(a) Install the stud bolt.
Torque:
17 N·m {173 kgf·cm, 13 ft·lbf}
2. INSTALL STUD BOLT (for RH Side)
HINT:
Perform the same proc ...
Disposal
DISPOSAL
PROCEDURE
1. DISPOSE OF REAR SHOCK ABSORBER
(a) Fully extend the shock absorber piston rod.
(b) Using a drill, make a hole in area B shown in the illustration to discharge
the gas inside. ...