Toyota Venza manuals

Toyota Venza: Dtc Check / Clear

DTC CHECK / CLEAR

1. CHECK DTC

(a) Connect the Techstream to the DLC3.

(b) Turn the ignition switch to ON.

(c) Turn the Techstream on.

(d) Read the DTCs by following the directions on the Techstream screen.

HINT:

Refer to the Techstream operator's manual for further details.

2. CLEAR DTC

(a) Connect the Techstream to the DLC3.

(b) Turn the ignition switch to ON.

(c) Turn the Techstream on.

(d) Clear the DTCs by following the directions on the Techstream screen.

HINT:

Refer to the Techstream operator's manual for further details.

Terminals Of Ecu
TERMINALS OF ECU 1. CHECK POWER BACK DOOR ECU (POWER BACK DOOR MOTOR UNIT) (a) Disconnect the L20 ECU connector. (b) Measure the voltage and resistance according to the value(s) in the table be ...

Data List / Active Test
DATA LIST / ACTIVE TEST 1. DATA LIST HINT: Using the Techstream to read the Data List allows the values or states of switches, sensors, actuators and other items to be read without removing any p ...

Other materials about Toyota Venza:

Vehicle Speed Signal Circuit between Stereo Component Amplifier and Combination Meter
DESCRIPTION The stereo component amplifier assembly receives a vehicle speed signal from the combination meter assembly to control the ASL function. HINT: A voltage of 12 V or 5 V is output from each ECU and then input to the combination meter ...

ECU Power Source Circuit
DESCRIPTION When the ignition switch is turned to ON, voltage from the ECM's MREL terminal is applied to the EFI MAIN relay. This causes the contacts of the EFI MAIN relay to close, which supplies power to terminal +B of the TCM. WIRING DIAGRAM PR ...

Starter Signal Circuit
DESCRIPTION 1. w/o Smart Key System While the engine is being cranked, current flows from terminal ST1 of the ignition switch assembly to the park/neutral position switch assembly and also flows to terminal STA of the ECM (STA Signal). 2. w/ Smart Key S ...

© 2016-2026 Copyright www.tovenza.com

0.1614